SERVER SETUP:-
1)move server Store to SERVER HALL.
2)Rack mount server.
3)power cable connection & poweron.
4)N/W connection.
5)by using console port upgarde firmware & setting console ip. 6)run Oracle VTS(Oracle hardware validation test based on the Oracle Solaris Operating System) for 24 hrs.
7)FC cable connection from SAN to HOST.
8)os installation(pre + post + applicaton + third party).
9)lun provisioning.
10)virtual machine creation.
11)HARD ware UAT.
1)move server Store to SERVER HALL.
2)Rack mount server.
3)power cable connection & poweron.
4)N/W connection.
5)by using console port upgarde firmware & setting console ip. 6)run Oracle VTS(Oracle hardware validation test based on the Oracle Solaris Operating System) for 24 hrs.
7)FC cable connection from SAN to HOST.
8)os installation(pre + post + applicaton + third party).
9)lun provisioning.
10)virtual machine creation.
11)HARD ware UAT.